Project Scope
Biogas Products Ltd were contracted to relocate existing CHP gas boosters to a location adjacent to the new Gas Holder.
This included the manufacture and installation of a new 200m, 200mm diameter, gas pipework system to connect the relocated boosters back into the digester gas system.
Design Requirement
The gas boosters were required to deliver 550m3/hr at a pressure of 100mbar from the new location.
Products/services
Our mechanical installation team completed the relocation of the boosters and installed the new stainless-steel gas pipework which was manufactured off site at our Works. Nitrogen purging was carried out as required.
Outcome
The relocated boosters are working successfully from the new location.