by biogaspr18 | Sep 13, 2018
Biogas Cooling System, Lincs, UK Client: AEL Biogas Project summary: Manufacture and install tube shell heat exchanger Project Scope The existing gas cooling system installed was not working efficiently and the Client was experiencing major problems with the CHP...
by biogaspr18 | Sep 13, 2018
Natural Gas Steel Pipework, BUSE Gas, UK Client: Ocktcom Ltd Project summary: Manufacture and install steel pipeline Biogas Products Ltd manufactured, installed and pressure tested the natural gas steel pipework system at Buse Gas site which consisted of 9no 1MW...
by biogaspr18 | Aug 30, 2018
Rectangular Biogas Holder, UK Client: Rose Hill Farm, Gloucestershire Project summary: Supply and install rectangle biogas holder onto existing digester Project Scope To supply a pvc membrane rectangular biogas holder on an existing digester site to increase gas...
by biogaspr18 | Aug 30, 2018
Membrane Gas Holder, Worksop WwTW, UK Client: Severn Trent Water Project summary: Supply and install membrane biogas holder Project Scope To supply a pvc membrane gas holder on a new digester site. Design Requirement A ¾ sphere PVC double membrane gas holder with a...
by biogaspr18 | Aug 8, 2018
Membrane Gas Holders, Multiple Sites, UK Client: Evergreen Gas (AD4Energy) Project summary: Double membrane gas holders Project Scope To supply a half sphere membrane gas holder on new far anaerobic digester installations Design Requirement A half sphere PVC double...