by biogaspr18 | Aug 30, 2018
Membrane Gas Holder, Worksop WwTW, UK Client: Severn Trent Water Project summary: Supply and install membrane biogas holder Project Scope To supply a pvc membrane gas holder on a new digester site. Design Requirement A ¾ sphere PVC double membrane gas holder with a...
by biogaspr18 | Jul 30, 2018
Biogas Reheater, Esholt WwTW, UK Client: Yorkshire Water (Grontmij) Project summary: Design and manufacture biogas reheater Project Scope To supply a biogas reheater on an existing anaerobic digester plant Design Requirement To increase the temperature of 600m3/hr...
by biogaspr18 | Jul 30, 2018
Biogas Dehumidifier, Crewe WwTW, UK Client: United Utilities (Nomenca) Project summary: Manufacture and install membrane gas holder Project Scope To supply a Biogas Dehumidifier to an existing Anaerobic Digester plant in the UK. Design Requirement To reduce the...